Facilities & Services personnel will work in collaboration with external contractors on Thursday, December 15 to replace an old rooftop unit on the WUIS building. Work will begin at 7:00 a.m. and last most of the day as the old unit is removed and the new unit is placed and connected. Room temperatures may be unstable on the east side of the building until the new unit is fully operational. 

A crane will be used to move the old and new units. Please do not enter the east hallway and do avoid the outside area while the crane is in operation from approximately 7:00 a.m. until 10:00 a.m. Additionally, crews will be on ladders in the east hallway all day to connect the new unit to electrical and mechanical systems in the ceiling so please use caution if you must be in that area.  

The drawing below depicts the planned location of the crane and the truck that will be transporting the rooftop units.